{"id":59772,"date":"2026-01-21T10:17:53","date_gmt":"2026-01-21T13:17:53","guid":{"rendered":"https:\/\/technik.com.uy\/projects\/piletas-torres-de-enfriamiento-pasarelas-frp\/"},"modified":"2026-03-11T13:56:41","modified_gmt":"2026-03-11T16:56:41","slug":"cooling-towers-frp-walkways","status":"publish","type":"projects","link":"https:\/\/technik.com.uy\/en\/projects\/cooling-towers-frp-walkways\/","title":{"rendered":"Cooling Towers \u2013 FRP Walkways"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">We delivered the design and structural verification of the solution, and supplied FRP walkways and supporting FRP structures for cooling towers\u2014prioritizing durability and corrosion resistance.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Installation required special planning and preparation, as the work was performed over an operating basin, with safety and logistics controls to minimize interference. A total of 150 meters of walkway were installed, providing safe and maintenance-friendly access for operations and inspections.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We delivered the design and structural verification of the solution, and supplied FRP walkways and supporting FRP structures for cooling towers\u2014prioritizing durability and corrosion resistance. &nbsp; Installation required special planning and preparation, as the work was performed over an operating basin, with safety and logistics controls to minimize interference. A total of 150 meters of&#8230;<\/p>\n","protected":false},"featured_media":59773,"template":"","meta":{"_acf_changed":false},"cmsms_project_category":[107],"class_list":["post-59772","projects","type-projects","status-publish","has-post-thumbnail","hentry","cmsms_project_category-structural-steel-piping-assembly"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59772","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":2,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59772\/revisions"}],"predecessor-version":[{"id":59786,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59772\/revisions\/59786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media\/59773"}],"wp:attachment":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media?parent=59772"}],"wp:term":[{"taxonomy":"cmsms_project_category","embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/cmsms_project_category?post=59772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}