{"id":59715,"date":"2026-01-21T10:11:51","date_gmt":"2026-01-21T13:11:51","guid":{"rendered":"https:\/\/technik.com.uy\/projects\/edificio-de-sopladores-cerramiento-y-mejoras-integrales\/"},"modified":"2026-03-11T13:37:44","modified_gmt":"2026-03-11T16:37:44","slug":"blower-building-enclosure-and-integrated-upgrades","status":"publish","type":"projects","link":"https:\/\/technik.com.uy\/en\/projects\/blower-building-enclosure-and-integrated-upgrades\/","title":{"rendered":"Blower Building \u2013 Enclosure and Integrated Upgrades"},"content":{"rendered":"<p>We delivered detailed engineering for the Blower Building enclosure, meeting specific requirements for ventilation and airtightness, and coordinated execution from prefabrication through commissioning.<\/p>\n<p>The solution included prefabricated heavy-duty galvanized steel framing and a multidisciplinary upgrade package: installation of stainless steel stacks, walkways and access platforms, a steel-framing partition wall, galvanized ventilation ductwork, insulation, and walkways combining steel structure and FRP. We also implemented changes to automation and control, installed a new electrical panel, and upgraded lighting, delivering a safer, more efficient, and maintenance-friendly facility.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We delivered detailed engineering for the Blower Building enclosure, meeting specific requirements for ventilation and airtightness, and coordinated execution from prefabrication through commissioning. The solution included prefabricated heavy-duty galvanized steel framing and a multidisciplinary upgrade package: installation of stainless steel stacks, walkways and access platforms, a steel-framing partition wall, galvanized ventilation ductwork, insulation, and walkways&#8230;<\/p>\n","protected":false},"featured_media":59717,"template":"","meta":{"_acf_changed":false},"cmsms_project_category":[107],"class_list":["post-59715","projects","type-projects","status-publish","has-post-thumbnail","hentry","cmsms_project_category-structural-steel-piping-assembly"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":1,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59715\/revisions"}],"predecessor-version":[{"id":59728,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59715\/revisions\/59728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media\/59717"}],"wp:attachment":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media?parent=59715"}],"wp:term":[{"taxonomy":"cmsms_project_category","embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/cmsms_project_category?post=59715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}