{"id":59653,"date":"2026-01-21T10:07:37","date_gmt":"2026-01-21T13:07:37","guid":{"rendered":"https:\/\/technik.com.uy\/projects\/ventiladores-de-caldera-mejoras-y-reemplazo-de-unidades\/"},"modified":"2026-03-11T11:11:07","modified_gmt":"2026-03-11T14:11:07","slug":"boiler-fans-upgrades-and-unit-replacement","status":"publish","type":"projects","link":"https:\/\/technik.com.uy\/en\/projects\/boiler-fans-upgrades-and-unit-replacement\/","title":{"rendered":"Boiler Fans \u2013 Upgrades and Unit Replacement"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">We performed a <\/span><b>unit replacement<\/b><span style=\"font-weight: 400;\"> on boiler fans\u2014equipment <\/span><b>critical to the operation<\/b><span style=\"font-weight: 400;\"> of the <\/span><b>Recovery Boiler<\/b><span style=\"font-weight: 400;\">. The intervention included decoupling the <\/span><b>rotor<\/b><span style=\"font-weight: 400;\">, a <\/span><b>full disassembly<\/b><span style=\"font-weight: 400;\"> of the assembly, and reassembly using <\/span><b>new components<\/b><span style=\"font-weight: 400;\">, following safety procedures and dimensional control practices.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">We reviewed clearances and fit-up, carried out <\/span><b>shaft alignment<\/b><span style=\"font-weight: 400;\">, and verified couplings and installation conditions\u2014delivering the equipment <\/span><b>on schedule<\/b><span style=\"font-weight: 400;\"> and with <\/span><b>high-quality workmanship<\/b><span style=\"font-weight: 400;\"> to ensure long-term reliability and availability in operation.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We performed a unit replacement on boiler fans\u2014equipment critical to the operation of the Recovery Boiler. The intervention included decoupling the rotor, a full disassembly of the assembly, and reassembly using new components, following safety procedures and dimensional control practices. &nbsp; We reviewed clearances and fit-up, carried out shaft alignment, and verified couplings and installation&#8230;<\/p>\n","protected":false},"featured_media":59654,"template":"","meta":{"_acf_changed":false},"cmsms_project_category":[106],"class_list":["post-59653","projects","type-projects","status-publish","has-post-thumbnail","hentry","cmsms_project_category-mechanical"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59653","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":1,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59653\/revisions"}],"predecessor-version":[{"id":59659,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59653\/revisions\/59659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media\/59654"}],"wp:attachment":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media?parent=59653"}],"wp:term":[{"taxonomy":"cmsms_project_category","embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/cmsms_project_category?post=59653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}