{"id":59500,"date":"2026-03-10T13:30:05","date_gmt":"2026-03-10T16:30:05","guid":{"rendered":"https:\/\/technik.com.uy\/projects\/upgrade-de-centro-de-control-de-motores-ccm-linea-de-enfardado-en-planta-de-celulosa\/"},"modified":"2026-03-10T13:35:13","modified_gmt":"2026-03-10T16:35:13","slug":"motor-control-center-mcc-upgrade-baling-line-in-a-pulp-mill","status":"publish","type":"projects","link":"https:\/\/technik.com.uy\/en\/projects\/motor-control-center-mcc-upgrade-baling-line-in-a-pulp-mill\/","title":{"rendered":"Motor Control Center (MCC) Upgrade \u2013 Baling Line in a Pulp Mill"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">During a planned plant shutdown, we delivered a full upgrade of the Motor Control Center (MCC) for a baling line. Existing panels were removed, and within 5 days we completed the full changeover to new modular sections, restoring the system ready for production restart.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">The scope included field survey and planning, pre-labeling, safe disconnection and reconnection, controlled torque tightening, re-labeling, and point-to-point testing of all circuits\u2014power, control, and communications. The execution focused on safety, traceability, and high reliability, ensuring an organized transition and a smooth start-up.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>During a planned plant shutdown, we delivered a full upgrade of the Motor Control Center (MCC) for a baling line. Existing panels were removed, and within 5 days we completed the full changeover to new modular sections, restoring the system ready for production restart. &nbsp; The scope included field survey and planning, pre-labeling, safe disconnection&#8230;<\/p>\n","protected":false},"featured_media":59502,"template":"","meta":{"_acf_changed":false},"cmsms_project_category":[103],"class_list":["post-59500","projects","type-projects","status-publish","has-post-thumbnail","hentry","cmsms_project_category-electrical-installations"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59500","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":1,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59500\/revisions"}],"predecessor-version":[{"id":59518,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59500\/revisions\/59518"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media\/59502"}],"wp:attachment":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media?parent=59500"}],"wp:term":[{"taxonomy":"cmsms_project_category","embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/cmsms_project_category?post=59500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}