{"id":59470,"date":"2026-03-10T13:22:07","date_gmt":"2026-03-10T16:22:07","guid":{"rendered":"https:\/\/technik.com.uy\/projects\/instalacion-de-puestos-de-carga-ultra-rapida\/"},"modified":"2026-03-10T13:24:10","modified_gmt":"2026-03-10T16:24:10","slug":"ultra-fast-ev-charging-stations-installation","status":"publish","type":"projects","link":"https:\/\/technik.com.uy\/en\/projects\/ultra-fast-ev-charging-stations-installation\/","title":{"rendered":"Ultra-Fast EV Charging Stations Installation"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">We delivered the engineering and electrical installation for 180 kW ultra-fast charging stations, from design through commissioning. The scope included conductor sizing calculations, protection design, and preparation of single-line diagrams and 3D electrical layouts.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">We completed the installation and wiring of the chargers, earthing\/grounding (PAT), and protection testing, including verification of residual current (RCD) protection. We also managed the utility submission and technical sign-off with UTE, delivering a fully documented and operational system.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We delivered the engineering and electrical installation for 180 kW ultra-fast charging stations, from design through commissioning. The scope included conductor sizing calculations, protection design, and preparation of single-line diagrams and 3D electrical layouts. &nbsp; We completed the installation and wiring of the chargers, earthing\/grounding (PAT), and protection testing, including verification of residual current (RCD)&#8230;<\/p>\n","protected":false},"featured_media":59472,"template":"","meta":{"_acf_changed":false},"cmsms_project_category":[103],"class_list":["post-59470","projects","type-projects","status-publish","has-post-thumbnail","hentry","cmsms_project_category-electrical-installations"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":1,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59470\/revisions"}],"predecessor-version":[{"id":59478,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/projects\/59470\/revisions\/59478"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media\/59472"}],"wp:attachment":[{"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/media?parent=59470"}],"wp:term":[{"taxonomy":"cmsms_project_category","embeddable":true,"href":"https:\/\/technik.com.uy\/en\/wp-json\/wp\/v2\/cmsms_project_category?post=59470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}