We delivered detailed engineering for the Blower Building enclosure, meeting specific requirements for ventilation and airtightness, and coordinated execution from prefabrication through commissioning.
The solution included prefabricated heavy-duty galvanized steel framing and a multidisciplinary upgrade package: installation of stainless steel stacks, walkways and access platforms, a steel-framing partition wall, galvanized ventilation ductwork, insulation, and walkways combining steel structure and FRP. We also implemented changes to automation and control, installed a new electrical panel, and upgraded lighting, delivering a safer, more efficient, and maintenance-friendly facility.




