We delivered the design and structural verification of the solution, and supplied FRP walkways and supporting FRP structures for cooling towers—prioritizing durability and corrosion resistance.
Installation required special planning and preparation, as the work was performed over an operating basin, with safety and logistics controls to minimize interference. A total of 150 meters of walkway were installed, providing safe and maintenance-friendly access for operations and inspections.




