Water Networks and Fire Protection Systems in Industrial Plants

We delivered detailed engineering, material supply, and installation of fire water networks for fire protection systems in industrial facilities, including projects at Dirox, Hexion, and Montes del Plata. The scope included on-site surveying, routing definition, drawings/isometrics, bill of materials, and installation planning—ensuring compatibility with existing infrastructure and compliance with applicable standards.

Execution covered piping prefabrication and installation, supports, testing, and documentation handover. We implemented welded systems in carbon steel and stainless steel, as well as hybrid solutions combining grooved piping with special couplings/clamps, improving installation speed and maintainability. The project was completed with quality control, inspections, and hydrostatic/functional testing to verify system integrity and readiness.

Gallery

Other projects

Boilers – Internal Cleaning Robot

We developed an internal boiler cleaning robot, designed to enter through existing access openings and reach deposit build-ups between tubes in hard-to-access areas. The solution significantly reduced cleaning time and enabled the work to be performed more safely, minimizing personnel exposure to confined spaces and hazardous conditions.   The system integrates precise positioning mechanisms using …

Success Case | Chemical Dosing Skids – Design and Fabrication

We designed and fabricated five chemical dosing skids, developing a custom solution for each application based on the chemical, required flow rate, process conditions, and operations/maintenance needs.   Each skid included metering pumps, measurement/instrumentation elements, a control and protection panel, variable frequency drives (VFDs), and a stainless-steel skid structure suitable for industrial environments. We also …

Motor Control Center (MCC) Upgrade – Baling Line in a Pulp Mill

During a planned plant shutdown, we delivered a full upgrade of the Motor Control Center (MCC) for a baling line. Existing panels were removed, and within 5 days we completed the full changeover to new modular sections, restoring the system ready for production restart.   The scope included field survey and planning, pre-labeling, safe disconnection …

Ultra-Fast EV Charging Stations Installation

We delivered the engineering and electrical installation for 180 kW ultra-fast charging stations, from design through commissioning. The scope included conductor sizing calculations, protection design, and preparation of single-line diagrams and 3D electrical layouts.   We completed the installation and wiring of the chargers, earthing/grounding (PAT), and protection testing, including verification of residual current (RCD) …

Planning, Installation & Commissioning of VFDs with Control System Integration

We delivered the planning, installation, and commissioning of Variable Frequency Drives (VFDs) from multiple brands (ABB, Schneider, WEG, and Siemens) for motor applications in pulp mills and the chemical industry, ensuring high reliability and production continuity.   The work covered all critical installation details: protection selection and coordination, proper ventilation/thermal management, earthing/grounding (PAT), high-quality power …