We delivered the engineering and electrical installation for 180 kW ultra-fast charging stations, from design through commissioning. The scope included conductor sizing calculations, protection design, and preparation of single-line diagrams and 3D electrical layouts.
We completed the installation and wiring of the chargers, earthing/grounding (PAT), and protection testing, including verification of residual current (RCD) protection. We also managed the utility submission and technical sign-off with UTE, delivering a fully documented and operational system.




